When the “One WO per Asset” option is enabled, one work order will be fired for each asset on a preventive maintenance (PM) schedule. For example, if you have a PM with 50 assets attached, 50 work orders with a single asset attached will fire when ...
A checkbox has been added to the asset record as well as at the class level called “PM Required”. All assets that require a preventive maintenance (PM) schedule should have this checkbox checked. Reports can then be generated showing which assets or ...