Hide ALL Completed Assets in Work Order

Hide ALL Completed Assets in Work Order

Back

  1. Tap on Work Order module from the left side menu
  2. Tap on an existing Work Order
  3. Tap on Assets tab
  4. Tap on Hide Complete at the bottom of the screen
    • Related Articles

    • Edit Asset from Work Order

      Back Tap on Work Order module from the left side menu Tap on an existing Work Order Tap on Assets tab Tap on the asset name Edit asset details Tap Save
    • Add Assets From GIS

      Back Tap on Work Order module from the left side menu Tap on an existing Work Order Tap on Assets Tab Tap on + Assets From GIS Follow the GIS tutorials for selecting single Assets or multiple Assets
    • Complete All Assets

      Back Tap on Work Order module from the left side menu Tap on an existing Work Order Tap on Assets tab Click on Complete All
    • Attach Work Order Cost to Asset

      Back Tap on Work Order module from the left side menu Tap on an existing Work Order Tap on Assets tab Tap on an asset Tap on Attach Cost Choose resource(s) Tap Attach Tap the Actions button and choose Calculate Cost
    • Select Multiple Assets

      Back Tap on GIS module from the left side menu Use your finger to zoom to the appropriate map level (a closer zoom makes it easier to select a single Asset) Tap on the Multiple Select button Tap your finger in multiple areas of the screen to select ...