Calculate Cost of an Existing Work Order

Calculate Cost of an Existing Work Order

Back

  1. Tap on Work Order module from the left side menu
  2. Tap on an existing Work Order
  3. If the Total Cost is incorrect, tap on Action button
  4. Tap on Calculate Cost
    • Related Articles

    • Attach Work Order Cost to Asset

      Back Tap on Work Order module from the left side menu Tap on an existing Work Order Tap on Assets tab Tap on an asset Tap on Attach Cost Choose resource(s) Tap Attach Tap the Actions button and choose Calculate Cost
    • Add Miscellaneous Cost to an Existing Work Order

      Back Tap on Work Order module from the left side menu Tap on an existing Work Order Tap on Resources tab Tap on + Cost in the middle of the screen Fill in all the details Tap Save
    • Add Resource(s) to an Existing Work Order

      Back Tap on Work Order module from the left side menu Tap on an existing Work Order Tap on Resources Tap on + Resource To choose an employee, tap on the Resource Name and choose a nap from the popup Add the Date (if it's different than the one ...
    • Add Existing Work Order

      Back Tap on Inspection module Tap on Actions button on top left Tap Work Order Filter through the list to find the record you are looking for Tap on the Work Order Tap Save
    • Add Items to an Existing Work Order - Work Order

      Back Tap on Work Order module from the left side menu Tap on an existing Work Order Tap on Parts tab Tap on + Part Select a part from list by searching or filtering through the list to pick one or multiple parts to attach Tap Save